Admix C-Series
Xypex Admixtures are added to the concrete at the time of batching, making it easy to install, and unlike other waterproofing methods, require less trades on site and shorten the time required for installation. The Admix C-Series has been specially formulated to meet varying project and temperature conditions.
Admix C-500/C-500 NF is formulated to have minimal or no effect on setting time. Admix C-1000/C-1000 NF is formulated for concrete mix designs where a normal or mildly delayed set is desired. Admix C-2000/C-2000 NF is designed for warmer climates and projects where a slower hydration rate is typically required. Admix C-500 NF Red and Admix C-1000 Red contains a red oxide pigment as a quality assurance measure for precasters.
Xypex Admixtures now contain the latest in Xypex innovation, the Visual Detection System (VDS). It is designed to confirm the presence of Xypex Crystalline Waterproofing Admixture in hardened concrete. To learn more about VDS, click here: VDS
Advantages of Xypex
- Integral part of concrete matrix
- Hydrostatic pressure
- Crack healing
- Chemical resistance
- Breathable
- Non-toxic
- No VOCs
- Is Permanent solution requiring no further maintenance
- Economical
- Shortens construction scheduled
- Extends service life on concrete
- Contains Visual Detection System
Recommended for
- Reservoirs and Water Holding Structures
- Water and Wastewater Treatment Plants
- Manholes and Pump Stations
- Precast Concrete
- Foundations
- Basements and Underground Parking Structures
- Tunnels and Subway Systems
- Secondary Containment
- Water Marine Structures
- Swimming Pools
*Refer to our Product Data for specifics
Packaging
Xypex Admix C-Series is packaged in convenient sizes of various types of packaging, including repulpable paper bags and soluble bags. Contact your local Xypex Technical Services Representative or dealer for details and availability.
Dosage Rate
Dosage will vary. Please refer to product data of the Admix product for specific dosage details.
Storage
Xypex products must be stored dry at a minimum temperature of 45ºF (7ºC). Shelf life is two years when stored under proper conditions.
Admix Application Details
General Resources

Plateau Potable Water Reservoir Vaudreuil-Dorion
The construction of a new potable water reservoir aimed to enhance water storage infrastructure with an emphasis on durability and reliability. A key challenge was ensuring that the reservoir’s watertightness and long-term durability would protect the potable water supply from contamination and leakage while withstanding constant water pressure and environmental stresses.

Renovation and Upgrading of the Bardy pool
The Réfection et mise aux normes de la piscine Bardy (Rehabilitation and standard’s upgrade) project in Québec aimed to modernize and upgrade the existing municipal pool to meet current safety, hygiene, and accessibility standards. A key challenge was ensuring the long-term waterproofing and protection of the concrete structure, which was exposed to constant water and chemicals. To address this issue, Xypex Admix C-500 was added directly to the concrete mix during the batching process.

Saint-Philippe New Wastewater Treatment Plant
The construction of a new wastewater treatment facility in Saint-Philippe presented a significant challenge in ensuring the long-term durability and watertightness of the wet well. The structure is constantly exposed to harsh wastewater conditions, including chemical attack and continuous moisture, making long-term durability and watertightness critical for operational performance. The public estimate for this project was $36.2 million.

Saint-Maurice Potable Water Reservoir Expansion
The Municipalité de Saint-Maurice undertook the expansion of its potable water reservoir system, constructing two new reservoir units for water treatment and distribution. A key design requirement for this project was to avoid the use of traditional membranes, which are prone to degradation, detachment, and long-term maintenance issues in water containment structures.
.jpg)
Couvrette Park – Aquatic Facilities and Chalet Construction
The City of Laval is revitalizing Couvrette Park to enhance recreational offerings and strengthen community infrastructure. The redevelopment plan includes the construction of a multifunctional chalet for all four seasons and modern aquatic facilities, creating a contemporary and accessible space for residents.
Projects Using This Product

Amos Rex Art Museum

Budapest Pedestrian Tunnel
The key challenges in building this pedestrian tunnel were the high water table created by the close proximity of the Danube River and addressing the need to prevent interruption of traffic flow on the street between the buildings. The street is both a major thoroughfare for cars as well as a street car line. The tunnel needed to be water tight to create a comfortable pedestrian space and the traffic needed to be maintained throughout the construction phase.

Rod el Farag Axis Bridge
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.

Sorek Desalination Plant
After thorough investigation, the project design team chose to include 1.5% of Xypex C-500 NF Admixture in the concrete mix to both heal cracks as well as improve the overall chloride durability of the pipe. As the pipe was jacked into place visible leaking was seen in the pipe sections. All visible leakage was seen to heal and the project became so impressed with Xypex’s crack healing ability that the use of the Xypex Admix was extended in the project to include most of the water processing and holding structures as well as the pipe.

Taylor Shellfish Processing Facility

Blacklick Creek Sanitary Interceptor Sewer
To further protect the concrete tunnel from the harsh conditions expected during its projected 100-year lifespan and to ensure watertight operation, the high performance concrete mix was enhanced with Xypex Admix C-500.

Panama Canal – Chamber Walls & Gatun Lock Culverts
The aggressive marine environment surrounding the over 80-year-old Panama Canal had caused substantial deterioration of the canal’s concrete. Xypex Admix C-2000 was used in the concrete repair mortar to rehabilitate the walls of the gatun lock chambers and conduits.