Admixture / Additive Schematics
Download these schematics and application instructions for Xypex Crystalline Technology waterproofing products.
The following construction details are provided to give information and guidance. Where available, regionally established construction details, norms, standards and practices should be followed. Discussion with local Xypex Technical Services Representatives and construction professionals is recommended. Follow all Xypex and other manufacturers’ specifications and installation instructions.
Select a Schematic Drawing
--- Full Set of Additive Schematics ---
1. Construction Joint - Traffic Bearing Slabs
2. Construction Joint - Non-Traffic Bearing Slab & Walls
3. Construction Joint - Wall onto Slab
4. Construction Joint - Slab into Wall to Keep Water Out
5. Construction Joint - Slab into Wall to Keep Water In
6. Standard Metal Pipe Detail
7. Concrete Wall & Slab - Below Grade - Slab onto Wall
8. Concrete Wall onto Slab - Below Grade - Slab onto Wall
9. Concrete Wall onto Slab - Below Grade - Slab onto Wall - Blind Side Forming or Interior Seal Strip
10. Multi-level Concrete Wall & Slab - Below Grade - Slab into Wall
11. Split Mat Slab - Non-Aggressive Soils / Water
12. Split Mat Slab - Aggressive Soils / Water
16. Hydraulic Elevator Pit
17. Elevator Pit / Sump Pit
21. Sewage Plant Clarifier Tank
24. Underground Vault / Dry Well
25. Precast Concrete Manhole