Precast Structures

Industrial Building

Kopavogur, Iceland

This roof top parking area was constructed in 2003 with an 8 cm topping over precast panels. Xypex was chosen as the only waterproofing method for this project. Xypex Admix C-1000 NF was used at a 1.5% dosage rate. Directly after construction, there was an area with minor leakage but this was fixed with an application of Xypex Concentrate. This project was visited in spring 2017 and it has remained dry since it was built. 

Project Sheet
Project Sheet PDF
1 of 3
This roof top parking area was constructed in 2003 with an 8 cm topping over precast panels. Xypex was chosen as the only waterproofing method for this project. Xypex Admix C-1000 NF was used at a 1.5% dosage rate. Directly after construction, there was an area with minor leakage but this was fixed with an application of Xypex Concentrate. This project was visited in spring 2017 and it has remained dry since it was built.