Wastewater Collection & Treatment

East Primary Pump Station

Hendry County, Florida, USA

Athens Utilities completed construction of the East Primary Pump Station to support wastewater conveyance and system reliability for the City of Athens. During project evaluation, the owner identified low velocity sewer flow as a contributing factor to the generation of hydrogen sulfide posing the risk of microbial induced corrosion.

Project Sheet
Project Sheet PDF
1 of 4
Based on internal research and technical discussions, Xypex Bio-San was selected as an integral concrete treatment to provide long term protection against concrete deterioration. Approximately 3,200 lbs. of Xypex Bio-San was incorporated into cast in place concrete supplied by Moon Concrete Services. The integral crystalline waterproofing system permanently seals capillaries and micro cracks while the bio active component inhibits the growth of acid producing bacteria associated with wastewater environments.

The successful implementation of Xypex Bio-San at one of the Primary Pump Station led Athens Utilities to further evaluate Bio-San for use across additional wastewater infrastructure, including manhole structures. The Xypex system provides concrete protection, reduced maintenance requirements, and long-term durability for critical wastewater assets.

Overview

Market Segment

Wastewater Collection &
Treatment

Engineer

Krebs Engineering

General Contractor

Cleary

Owner

Athens Utilities

Concrete Producer

Moon Concrete Services

Location

Hendry County, Florida, USA

PRODUCTS USED
Bio-San
+ Show Details

A uniquely designed admixture for integral, long-term protection of concrete in harsh sewage conditions with levels of H2S that cause microbial induced corrosion (MIC). Bio-San combines potent antimicrobial protection along with the unique crystalline technology of the Xypex Admix C-Series.