East Primary Pump Station
Athens Utilities completed construction of the East Primary Pump Station to support wastewater conveyance and system reliability for the City of Athens. During project evaluation, the owner identified low velocity sewer flow as a contributing factor to the generation of hydrogen sulfide posing the risk of microbial induced corrosion.
The successful implementation of Xypex Bio-San at one of the Primary Pump Station led Athens Utilities to further evaluate Bio-San for use across additional wastewater infrastructure, including manhole structures. The Xypex system provides concrete protection, reduced maintenance requirements, and long-term durability for critical wastewater assets.
Overview
Market Segment
Wastewater Collection &
Treatment
Engineer
Krebs Engineering
General Contractor
Cleary
Owner
Athens Utilities
Concrete Producer
Moon Concrete Services
Location
Hendry County, Florida, USA
PRODUCTS USED
Bio-SanA uniquely designed admixture for integral, long-term protection of concrete in harsh sewage conditions with levels of H2S that cause microbial induced corrosion (MIC). Bio-San combines potent antimicrobial protection along with the unique crystalline technology of the Xypex Admix C-Series.