General Construction Foundation

Nusco Real Estate Multi-Functional Complex – Pipera 48

Bucharest, Romania

This ambitious development in Bucharest consists of a set of high-end apartment blocks and multi-functional spaces featuring an extended two-level basement situated beneath the entire complex. Given the scale of the structure and the necessity for long-term structural integrity, a comprehensive Xypex crystalline waterproofing solution was specified to protect the foundations and below-grade areas. 

Project Sheet
Project Sheet PDF
1 of 2
The project utilized a massive volume of specialized concrete, with 15,865.5 m3 of foundations and perimeter walls treated with Xypex Admix C-1000NF. This integral protection ensures the concrete remains waterproof even under hydrostatic pressure.

Additionally, 9,033.3 m2 of perimeter walls, including specialized areas such as ALA (civil defense) shelters, gutters, and access ramps, were treated with Xypex Concentrate. The project's water tanks also received a specialized application of Xypex Concentrate covering 1,110.3 m2. This dual-layer approach—combining Admix for the structural pour and Concentrate for critical details—guarantees a permanent, maintenance-free waterproofing solution for one of Bucharest’s premier new residential hubs.

Overview

Market Segment

General Construction

Owner/Developer

Nusco Real Estate

General Contractor

Pedro Company Constructexim

Location

Bucharest, Romania

PRODUCTS USED
Admix C-1000 NF
+ Show Details

Incorporated during batching, add waterproofing and durability to the concrete, with formulations available for a diverse range of mix designs for above-ground and underground structures.

Concentrate
+ Show Details

Applied as a cementitious slurry to the surface of existing above or below-grade structures to waterproof and protect the concrete against high hydrostatic pressure and aggressive environments.