Cherokee Lift Station No. 1 Sand Creek Facility Addition
This project involved the construction of a new lift station to replace existing wastewater settling ponds in compliance with updated EPA regulations. The new lift station serves as a fully enclosed holding tank designed to manage wastewater efficiently while ensuring long-term durability and environmental compliance.
Its advanced crystalline technology enables self-healing of micro-cracks and resistance to hydrostatic pressure, ensuring long-term impermeability and structural integrity. Xypex Bio-San offered a durable, cost-effective, and maintenance-free alternative to membranes, particularly for complex or high-exposure structures. Environmentally sustainable, it reduces waste and labour costs while outperforming membranes in harsh conditions.
Overview
Market Segments
Wastewater Treatment
Plant
Owner
Cherokee Metropolitan
District
Engineer
JVA, Inc. (Boulder)
Construction Manager
Rice Lake West (fka
Stanek Constructors -Golden CO)
Ready-Mix
Holcim (Colorado Springs)
Location
Colorado Springs,
Colorado USA
PRODUCTS USED
Bio-SanA uniquely designed admixture for integral, long-term protection of concrete in harsh sewage conditions with levels of H2S that cause microbial induced corrosion (MIC). Bio-San combines potent antimicrobial protection along with the unique crystalline technology of the Xypex Admix C-Series.