egypt

Rod El Farag Axis Bridge

Cairo
More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.

Country Projects Banner

 

project_bar
  • Xypex Project

    Private Farm – Fertilizer Pit

    Cairo These concrete fertilizer pits on a farm outside of Cairo had to be rendered impermeable to the attack of the chemicals used to decompose the material wastes within them. Xypex Concentrate was applied to the surface of the structures. Subsequent inspections indicated no leakage or deterioration of the concrete.
  • Xypex Project

    Rod el Farag Axis Bridge

    Cairo More than one million cubic meters of concrete was used to build the bridge, which was used in the bridge decking, girders, and six 92 m (302 ft) tall concrete towers that support 160 steel support cables. One of the key challenges for the bridge designers was how to adequately protect the critical concrete structures from the effects of air pollution and the moist riverine environment.
  • Xypex Project

    Shebin El Koum Sewage Station

    Cairo The concrete in this major wastewater treatment plant of 35,000 m2 was waterproofed and protected with Xypex products.
  • Xypex Project

    Suez Canal Road Tunnels

    Four subcontractors, one each for the four highway tunnels, applied the Xypex Concentrate where needed. According to Amr Saad, approximately 95 percent or more of the seepage has been stopped using Xypex Concentrate.