Project Detail
  • Ayrton Senna Tunnel Complex

    São Paulo, Brazil

    This tunnel passes under the lagoon in Ibirapuera park. A two-coat shotcrete application of Xypex Concentrate was applied to 2,800 meters of concrete, in two separate tubes within the tunnel. Xypex Patch'n Plug was used to seal the cracks with water seepage.

    BACK

Scroll to top