Project Detail
  • Chaira Hydro Power Plant

    Chaira, Bulgaria

    The concrete located 350 m under the surface of this electric power plant had cracked and was leaking. Xypex Patch'n Plug and Concentrate were used on a gradual basis until all the leaks were stopped.

     

    BACK

Scroll to top