Egbin Power Station
In 2018, the Egbin Power Station in Lagos, Nigeria, undertook a significant construction project involving the stabilization of foundations and the construction of a fence. The project spanned 15 months and was marked by a critical design change midway, requiring the piles to be fabricated on land and then submerged in water. Xypex products were chosen for their proven reliability and ability to meet the project's demanding requirements.
This ensured the long-term stability and sustainability of the foundation. Additionally, Xypex Patch 'n Plug played a crucial role during repair work and for aligning the piles. Its rapid setting time significantly reduced labor time and minimized downtime, contributing to the overall cost-effectiveness of the project.
The use of Xypex products in the Egbin project resulted in lower material costs and an extended service life for the structures. The project successfully maintained alignment and stability while ensuring the transportation of materials was efficient and sustainable. By selecting Xypex, the project benefitted from enhanced durability, chemical resistance, and cost efficiency, solidifying Xypex's reputation for delivering reliable and effective concrete solutions.
Overview
Market Segments
General Construction Foundations
Contractor
Lymex Ltd
Location
Lagos, Nigeria
PRODUCTS USED
Patch'n PlugFormulated as a crystalline, fast-setting hydraulic cement compound for concrete patching and repair. It stops flowing water in seconds and is used to seal cracks, fill tie-holes and other defects in concrete.
Incorporated during batching, add waterproofing and durability to the concrete, with formulations available for a diverse range of mix designs for above-ground and underground structures.