Wastewater Collection & Treatment | Water Treatment Plants

Showa Glove Factory

Binh Duong, Vietnam

Xypex is again selected to waterproof and protect all water tanks, a water treatment plant, and a waste treatment plant of the factory. Total area is approximately 2,400 m2 with 7,054 tie holes, and 694 meters of construction joints. All construction joints are sealed by Xypex Concentrate Dry-Pac method without use of waterstops. Work was completed in July 2004.

1 of 1
Xypex is again selected to waterproof and protect all water tanks, a water treatment plant, and a waste treatment plant of the factory. Total area is approximately 2,400 m2 with 7,054 tie holes, and 694 meters of construction joints. All construction joints are sealed by Xypex Concentrate Dry-Pac method without use of waterstops. Work was completed in July 2004.