For the Vietcombank Tower, Xypex products were applied by Bachy to repair defective concrete at all leakage points in the diaphragm wall construction joints and to seal all rebar penetration along the perimeter of the basement slab. The successful completion of these repairs in November 2012 resulted in the decision to use Xypex Concentrate to waterproof all four levels of diaphragm walls.

DISTRIBUTOR

Send E-mail
  • Xypex Project

    Amata Industrial Park – Tower Tank

    Bien Hoa, Dong Nai Xypex was selected by Bechtel to waterproof a tower tank 27 m above the ground. Defective concrete was chipped out and repaired with Xypex Concentrate followed by the application of a 2:1 cement mortar patching compound. Xypex Concentrate and Modified were then applied over the repaired concrete.
  • Xypex Project

    Amata Industrial Park – Water Supply Plant

    Bien Hoa, Dong Nai
    Xypex provided both the material and technical guidance to repair and waterproof the subterranean construction joints of these two 2,500 m2 water tanks where high hydrostatic pressure was causing leakage. Approximately 160 linear meters of construction joints were repaired and waterproofed.
  • Xypex Project

    Bluescope Steel Factory

    Phu My Xypex products were chosen to waterproof the basement pits and water tanks due to its capability to be applied during rainy conditions and can be backfilled after 36 hours of moist curing.
  • Xypex Project

    Daisin Vietnam Factory

    Bien Hoa, Dong Nai Xypex was selected to waterproof the waste and water treatment plants, grease traps, and waste pits. After repairing defective concrete, over 2,000 tie holes were sealed using Xypex Concentrate with a 2:1 cement mortar dosed with Admix C-2000 per weight of cement. Afterward, a two-coat system of Concentrate was applied to all tanks. Total quantity treated was approximately 1,120 mand 514 m of construction joints.
  • Xypex Project

    Dau Tieng Dam

    Tay Ninh
    After a successful trial in 1997, Xypex was specified and used to waterproof 400 m2 of the upstream discharge chamber of this dam. Xypex also supplied on-site technical support.
  • Xypex Project

    Sanyo Home Appliance Factory – Phase 1 & 2

    Bien Hoa, Dong Nai In phase 1, Xypex products were used to repair and waterproof a 100 m2 septic tank. Two roofs of a toilet room and an utility room were also waterproofed with a two-coat system of Xypex Concentrate & Xypex Modified without any protection mortar. Xypex was used to waterproof the factory gutters and a small roof at the Phase 2 of this factory.


  • Xypex Project

    Japanese Consulate – Residence

    Ho Chi Minh City

    Repaired an old concrete roof and gutters where repeated repairs with membrane system were unsuccessful. All existing mortar and membranes were removed and a 2 coat application of Xypex Concentrate and Modified was applied over the concrete roof. A protection mortar topping was then applied over the Xypex coating. Total area treated was 60 m2 and completed in June, The main contractor is Hazama Corporation.

  • Xypex Project

    Fujitsu Computer Factory – Phase 1 & 2

    Bien Hoa, Dong Nai This project required the repair of cracks and the waterproofing of the concrete roof at the utility building and the new canteen building. Existing mortar topping was removed. A standard two-coat system of Xypex Concentrate and Modified was applied. A new protective mortar was placed on top as protection for the concrete. Xypex Concentrate was also applied to the toilet floors and some floor areas of the canteen building.
  • Xypex Project

    Diamond Plaza – International Business Center

    Ho Chi Minh City Xypex products were used to repair and waterproof a wide variety of places within this 22-storey building, including: screen wall coves along diaphragm walls; septic tank; 3 water tanks; 2 elevator pits; one electrical vault; machine room slab; bathrooms and laundry rooms.
  • Xypex Project

    Brewery Methane Tank

    Hoc Mon, Ho Chi Minh City 65 m of cracks on a seven meter high methane tank full of water was repaired by the use of Xypex. High pressure leaks were plugged with Patch'n Plug, followed by an application of Dry-Pac. Dampness persisted for three days and totally dried after the fourth day.
  • Xypex Project

    Showa Glove Factory

    Binh Duong

    Xypex is again selected to waterproof and protect all water tanks, a water treatment plant, and a waste treatment plant of the factory. Total area is approximately 2,400 m2 with 7,054 tie holes, and 694 meters of construction joints. All construction joints are sealed by Xypex Concentrate Dry-Pac method without use of waterstops. Work was completed in July 2004.

  • Xypex Project

    Sun Wah Tower

    Ho Chi Minh City Upon consulting with their Japan headquarters, the decision resulted in selecting Xypex for the job. Total area treated was 198 m2 and 102 linear meters of construction joints. 

  • Xypex Project

    Tan Thuan Export Processing Plant

    Nha Be Xypex materials and technical support were selected to repair the leaks caused by high water pressure on the exterior faces and construction joints of 11 tanks. Xypex was also chosen because of its resistance to aggressive chemicals.
  • Xypex Project

    The Metropolitan Towers

    Ho Chi Minh City Xypex Concentrate and Patch’n Plug was used to repair 4 newly waterproofed tanks and septic tank from the exterior against water pressure in 1997. Additional repairs extended to sealing ceiling cracks, leaks in elevator pit, basement walls and slab in 1998. The application was made on the outside and covered 77 linear meters of cracks and construction joints and 40 tie holes. 

  • Xypex Project

    Vietcombank Tower

    Ho Chi Minh City For the Vietcombank Tower, Xypex products were applied by Bachy to repair defective concrete at all leakage points in the diaphragm wall construction joints and to seal all rebar penetration along the perimeter of the basement slab. The successful completion of these repairs in November 2012 resulted in the decision to use Xypex Concentrate to waterproof all four levels of diaphragm walls. 
  • Xypex Project

    Yazaki Eds Wire-Harness Factory

    Di An, Binh Duong
    The roof, 43 m in length, had many shrinkage cracks due to thermal stress. The previous waterproofing product used on the underground water tank failed due to the low pH content in the water.  The area was repaired with Xypex Patch'n Plug and Concentrate. The entire surface of the roof and gutter was then treated with a two-coat application of Xypex Concentrate and Modified. Total area treated was approximately 925 m2.
  • Xypex Project

    Thủ Dầu Một Park Swimming Pool

    Ho Chi Minh City The perimeter walls of this swimming pool were seriously leaking due to a defective concrete pour. All defective concrete was removed and Xypex Patch'n Plug and Xypex Concentrate were used to repair and waterproof 80 linear meters of construction joints.
  • Xypex Project

    Vinhome Central Park Landmark 81 Tower

    Tan Cang Street, Binh Thanh District, HCMC Following the continuing success of all previous projects since 1998, Xypex was again selected by the diaphragm wall contractor, Bachy Soletanche Vietnam, to supply and provide technical support to repair all defective concrete on the diaphragm walls. All construction joints, and rebar penetrations along with the basement perimeter slabs were sealed with Xypex Concentrate and Xypex Patch'n Plug was used to stop any pressure leaks. The main contractor of the entire Vinhomes Central Park Development project is Delta Construction JV Co.
  • Xypex Project

    Saigon Center Phase 2-3

    Le Loi Street, District 1, HCMC, Vietnam The expansion of Saigon Center, the first high rise project in Vietnam, includes an addition of a six level basement connecting to the existing three level basement. The diaphragm wall contractor, Bachy Soletanche Vietnam selected Xypex as the sole repair system to seal all defective concrete, and also to seal all leaks from the inside face of the diaphragm walls. The main Contractor of the project is Hoa Binh Construction. After witnessing the result of Xypex's effectiveness in sealing against negative hydrostatic pressure leaks and its reliability throughout the basement project, they decided to use Xypex on their new project, The Vinhomes Ba Son Golden River, also located in District 1, HCMC.
  • Xypex Project

    Vinhome Ba Son Golden River - Phase 1

    02 Le Duan Street, District 1, HCMC Xypex is again selected by Bachy Soletanche Vietnam to supply and provide technical support for defective concrete repairs at the diaphragm wall's construction joints and rebar penetrations. The project commenced in April 2016 and is still on-going. Because this site is the former Ba Son Ship Yard right by the Saigon River, the main contractor, Hoa Binh Construction, decides to use Xypex to waterproof the initial 12,000 m2 basement for the 6 towers of the 1st Phase. Preparation is underway to arrange for application as of September, 2016.  
  • Xypex Project

    Vinhomes Central park Landmark 81 Tower

    Tan Cang Street, Binh Thanh District, HCMC Witnessing the effective performance of Xypex on site, the design consultant, MACE, approved Coteccon's request to use 2,448 kg of Xypex Concentrate, to seal all the pile caps before placing the 8 meter thick matt foundation for this 81 story tower. Within the same development but in a separate project, over 8,100 kg of Xypex Concentrate were supplied to Delta Construction JV Co., the Main Contractor of the Vinhomes Central Park Development, to repair and waterproof the perimeter diaphragm walls of the whole project, including the basements of the Phase1 Residential Towers. 
  • Xypex Project

    HCMC Metro Line 1 Package 2 Aboveground Stations Crack Repair

    Ho Chi Minh City Xypex Vietnam is selected by GS Engineering & Construction to repair originally 300 linear meters of cracks at the 5 newly constructed aboveground Metro Stations. Cracks are cut to a U-shape groove and plugged with Xypex Concentrate Dry-Pac, then followed with two coats of Xypex Concentrate slurry. Repair commenced in November 2016 and completed at the end of January 2017 with a total quantity of over 600 linear meters repaired for the above 5 stations. Xypex will also repair the Thu Duc Stations once construction is completed.
  • Xypex Project

    HCMC Metro Line 1, Package 1B, Opera House Station

    Le Loi St and Nguyen Hue St., District 1, HCMC Xypex is selected by Bachy Soletanche Vietnam, the Diaphragm Wall Contractor, as the primary concrete and leak repair system for this 5 level underground station along Nguyen Hue street & Le Loi Street. As of November 2016, after witnessing the effective repair results for over 18 months, the Main Contractor, Shimizu Maeda JV Construction Co. is seriously considering to use Xypex coatings to waterproof all the diaphragm walls of the Opera House Station and the Ba Son Station. Project is on-going and scheduled to complete in 2019.