Download Schematic Drawings (PDF)

 

Select a schematic drawing:
Construction Joint - Walls & Slabs
Construction Joint - Walls/Slab Interface
Concrete Wall and Slab - Below Grade
Foundation Wall - Inside Application
Retaining Wall
Concrete Block Wall - Below Grade
Concrete Block Wall - Above Grade
Parking Deck
Roof/Plaza Deck
Elevator Pit/Sump Pit
Planter
Tunnel
Swimming Pool
Sewage Plant Clarifier Tank
Sewage Plant Digester Tank
Reservoir/Wet Well
Underground Vault/Dry Well
Precast Concrete Manhole
Standard Metal Pipe Detail
Ferro-Cement Boat, Caisson, Floating Dock
Bridge

 
Print Friendly Version
Download as PNG
Download as PDF

1. Place block in joints to allow 0.5 to 0.75 inch (13 mm to 19 mm) gap between precast sections. Fill exterior gap with Xypex Patch'n Plug grout.

2. Apply one slurry coat of Xypex Concentrate to the interior gap at the rate of 1.5 lb./sq. yd. (0.8 kg/m2), then fill gap to surface with Xypex Concentrate in Dry-Pac form.

3. Apply one slurry coat of Xypex Concentrate to interior of bottom ring, floor and exterior walls at the rate of 1.25 to 1.5 lb./sq. yd. (0.65 to 0.8 kg/m2).

4. After placement of concrete trough, apply one slurry coat of Xypex Concentrate at the rate of 1.5 lb./sq. yd. (0.8 kg/m2) to its surface.

Note 1: Schematic diagram shows Xypex application details only and does not depict standard requirements for waterstops or expansion joint sealants.

Note 2: Schematic drawing shows Xypex Coating application. Specifier may consider the alternative use of Xypex Dry Shake (DS-Series) or Xypex Additive (Admix C-Series), where applicable. Refer to Standard Specifications for more information.