Project Detail
  • 327 Royal Palm

    Boca Raton, FL, USA

    Due to the high density of population, and restrictions on construction, this below grade foundation concrete placements have to be done in multiple segments. The last picture is the application of Xypex Concentrate slurry prior to installation of the Miraseal water stop. Recommended Construction Joint details when using the Xypex Admixture.

    BACK