• select
  • select
  • Find
Latest News
  • alley111-01

    Alley 111 Mixed Use Condo Building

    May 19, 2014
    The new 12-story Alley 111 mixed-use high-rise in downtown Bellevue, Washington included a LEED-point eligible water retention vault to capture and store stormwater per the city’s building code. This structure was constructed using a blind-side shotcrete method with Xypex Admix C-500 to ensure that it is watertight.

    » Read Project Details