Approximately 1,000 m3 of precast product was treated with Xypex Admix C-5000 at a grade of 50 MPa. Besides enhancing durability, benefits of Xypex Admix C-5000 include ease of application into the concrete mix, workability with vertical pours and the long term benefits of the Xypex crystalline process.

DISTRIBUTOR

Send E-mail
  • Xypex Project

    Anderson Point Port Facility

    Port Hedland This project will mine and export through the Anderson Point Port Facility, 45 million tonnes per annum (mtpa) of Iron ore to markets in Asia. Xypex C-Series is spec’d into all concrete elements of the berthing facility, to provide enduring protection for this vital asset. As of June 2011, Berths 1 & 2 are complete, with Berth 3 underway.
  • Xypex Project

    Australian Marine Complex

    Perth Approximately 1,000 m3 of precast product was treated with Xypex Admix C-5000 at a grade of 50 MPa. Besides enhancing durability, benefits of Xypex Admix C-5000 include ease of application into the concrete mix, workability with vertical pours and the long term benefits of the Xypex crystalline process. 
  • Xypex Project

    Bogong Power Station

    Bogong Xypex Admix C-Series was specified for use in 12,000 m³ of concrete for this new power station development, designed to provide an additional 140 MW to the Kiewa hydroelectric scheme. The Xypex system was used to enhance long-term durability and provide added waterproofing integrity for this vital infrastructure development.
  • Xypex Project

    Busselton Jetty

    Busselton Xypex Admix C-5000 was specified for all concrete used in the refurbishment as protection of concrete used in a marine environment.
  • Xypex Project

    Cronulla Marina

    Sydney Dosed at 4 kg/m3 with Xypex Admix C-2000 NF, this mix was designed to achieve 32 MPa at 48 hours and 50 MPa in seven days. The two-tonne post-tensioned units of this floating concrete structure had to be lifted from their formwork 36 - 48 hours after casting.
  • Xypex Project

    Flinders Ports Berth 8 Outer Harbour Grain Wharf

    Adelaide Xypex Admix C-1000 NF was specified as the most suitable product to effectively protect the concrete structure from the harsh marine environment. Pile plugs, pile caps, rear ramp support walls, wharf beams, deck and ramps were all dosed with Admix C-1000 NF at a rate of 3.9 kg per meter.
  • Xypex Project

    Melbourne Zoo – Trail of Elephants

    Melbourne More than two hectares of land were redeveloped with walking trails in a matrix of ‘tropical rainforest’, consisting of a diverse palette of planting material. In excess of 160 m3 of shotcrete and insitu concrete was dosed with Xypex Admix C-1000 NF in the Elephant Pool and the balance tank.
  • Xypex Project

    Qantas Domestic Terminal – Kingsford Smith Airport

    Sydney Xypex Concentrate and Modified were used to waterproof and protect the footpath and roadway over the arrivals hall of this airport terminal. Xypex Gamma Cure was used to speed the curing process.
  • Xypex Project

    Sandy Bay Seawall

    Tasmania An existing seawall had become delapidated due to decades of constant, severe exposure to wind, tides and wave action. Xypex Admix was chosen for concrete protection against aggressive chloride attack. Xypex was favoured over other systems due to the ease of application, benefits to the host concrete, longer service life and cost.
  • Xypex Project

    Sewage Reticulation Plant

    Puckapunyal Repair and restoration of this 50-year-old plant, located at the Puckapunyal Royal Australian Army Base, was completed using Xypex Patch'n Plug and a two-coat application of Xypex Concentrate and Modified. However, the A.C.S. now estimates that the plant has gained 25 - 30 years usable life.

  • Xypex Project

    Sydney Harbour Tunnel

    Sydney Extensive crack repair was undertaken using Xypex after other products failed to stop water seepage. Xypex products were selected ahead of some 52 others to repair the extensive cracking that has occurred. Xypex products are applied firstly to shut down the water flow. Two work crews spent three months in the tunnel using both Xypex Patch'n Plug and Xypex Concentrate to stop leaks. 


  • Xypex Project

    Sydney Opera House

    Sydney
    With a series of large precast concrete "shells", each composed of sections of a sphere of 75.2 metres (246 ft 8.6 in) radius, forming the roofs of the structure, set on a monumental podium. It is supported on 588 concrete piers sunk as much as 25 m (82 ft) below sea level. Xypex Admix was used to waterproof 200 m3 of concrete.
  • Xypex Project

    Beechworth Honey Factory

    Corowa, NSW Xypex Admix C-series was specified in the base slab of the Beechworth honey farms manufacturing warehouse. To increase the surface protection from this aggressive environment Xypex applied a half dose of Xypex Concentrate DS-1 to the surface for addition protection for long term durability against abrasion. In addition, some areas suffered from the effect of the concrete supplier overdosing the retarder. These areas were repaired with Xypex Megamix.
  • Xypex Project

    Benelong Point

    Sydney Xypex Admix was used throughout this project to waterproof and protect the concrete walls and slabs.
  • Xypex Project

    BOC Gases Headquarters

    North Ryde
    Xypex Admix NF was blended with 600 m3 of concrete to waterproof and protect the roof deck of this building.
  • Xypex Project

    Citigroup Headquarters Building

    Sydney Xypex Admix C-1000 NF and Admix C-2000 NF were used in the 90 MPa concrete. Xypex Concentrate DS-1 was applied to concrete 150 m above street level.
  • Xypex Project

    Crotty Dam Dewatering Outlet Shaft

    Queenstown Xypex products were used for repair of structural defects, patching of tie rod holes, and sealing of high pressure leaks. Prior to these repairs, it was estimated that the shaft was taking in over 400 litres (106 US gallons) of water per minute. Once the repairs were completed, a two coat application of Xypex Concentrate was applied to internal shaft surfaces totalling 1,600 m2 (17,200 sq ft). 
  • Xypex Project

    Dee Why Seawall

    Dee Why Xypex Admix was used in the mix design to help achieve greater concrete durability. Durability was one of the most important objectives in the design of this seawall. Aesthetics were also a prime objective and a beige oxide was added to the Xypex Admix used in all visible areas.
  • Xypex Project

    Hisense Arena

    Melbourne Xypex Admix C-1000 NF was blended into the concrete mix to waterproof and protect the precast bleachers for this multipurpose stadium (formerly named the Vodafone Arena). The seating design of this stadium is stunningly innovative and the contractors used the latest technology to ensure that the arena would accommodate a wide range of functions.
  • Xypex Project

    Homebush Bay Aquatic Centre

    Homebush Bay Before tiles were laid, a coating of Xypex Concentrate was applied to the fine shrinkage cracks in the formed walls of the pool areas throughout the complex.
  • Xypex Project

    Iluka Minerals Process Water Tank

    Geraldton 45 cubic meters of Admix treated shotcrete was sprayed up against the existing metal walls and approximately 100 lineal meters of a special waterstop wasplaced at the floor wall intersection. On completion of the repairs, the tank was filled and while initially there were a number of minor leaks, these reduced to zero within 10-14 days as the Xypex crystalline development took place. The structure is now fully ‘returned to service’ and remains watertight.
  • Xypex Project

    Interactive Underground Restaurant – Darling Harbour

    Sydney Xypex Admix was used in 3,700 m3 of concrete to waterproof the hydrostatic slab, pits, tanks, walls and podium.
  • Xypex Project

    Lascelles Wharf

    Geelong With a design mix that included Xypex Admix C-Series, these 20+ tonne, 40 MPa slabs were installed as part of a major upgrade of the Lascelles wharf facility.
  • Xypex Project

    Melbourne Aquarium

    Melbourne The below-ground aquarium tanks and viewing areas (adjacent to the Yarra River) exhibited leakage in various areas due to cracks and defective joints. All leakage was eliminated by using the Xypex concrete repair system (Xypex Concentrate and Patch’n Plug).
  • Xypex Project

    Microsoft Building

    Sydney Xypex Admix C-1000 was used to dose 1,200 m3 of concrete on the roof deck of this office building.
  • Xypex Project

    Minto Malting Plant

    Sydney, NSW The construction of this malting plant consisted of fifteen main buildings and many interconnecting steel gantries, towers and linkways that form part of the automated malt processing facility that is expected to outload approximately 110,000 tonnes of malt per annum. Xypex Admix C-Series was specified into the slab and roof sections of the vessels.
  • Xypex Project

    Olympic Park Train Station

    Homebush Bay Xypex Admix C-2000 was used in the concrete mix to waterproof the elevator pits in this train station.
  • Xypex Project

    Robina Town Centre

    Robina
    To date, 13,000 m3 of concrete have been dosed with Xypex Admix C-2000, including the exposed deck and walls, and fire service tanks. Xypex Concentrate slurry has been used along with Xypex Dry-Pac in the joints. This project is on-going with plans for Xypex to be used in the sewage treatment plank and rail link to Brisbane.
  • Xypex Project

    Sea World – Polar Bear Shore

    Gold Coast The Polar Bear enclosure utilised Xypex Admix C-1000 NF and Kuniseal C-31 waterstop for the pool to ensure concrete waterproofing integrity. Xypex Admix C-1000 NF was used to waterproof, protect and improve the concrete's durability for the Sea World Polar Bear enclosure. 
  • Xypex Project

    Stadium Australia

    Homebush Bay Xypex Admix was selected to waterproof, protect and enhance approximately 25,000 m3 of the stadium’s concrete. Xypex was used to waterproof and protect numerous areas of the 110,000 seat Olympic Stadium. Specifically, Xypex Admix was utilized in the concrete of four large below-ground water storage tanks, various pits, lift over-run pit and retaining walls, lower tier moveable seating, mid tier seating and suspended slabs exposed on Level 1.
  • Xypex Project

    Sydney Airport Tunnel – M5 Motorway

    Sydney
    Xypex was used to meet the concrete waterproofing specifications for the freeway (road) tunnel which runs below the Cooks River beside Sydney’s Mascot Airport. The project involved two contracts – one for 5,000 m3 (Cooks River trough section) and another for 1,200 m3 (Turella Shaft Tunnel).
  • Xypex Project

    Sydney’s Taronga Zoo

    Sydney
    Xypex Admix C-1000 was added to the 300 m3 of concrete used in the construction of the clarifier and treatment tanks. These tanks contain potable water for the zoo’s animals.
  • Xypex Project

    Visitors Marina – Darling Harbour

    Sydney Xypex Admix C-2000 was used to waterproof and prevent the ingress of chlorides into these pre-stressed, pre-cast units. The Xypex assisted in providing long-term durability to this floating concrete structure.
  • Xypex Project

    Werribee Zoo

    Victoria The enclosure’s concrete pools, measuring 170 metres long x 10 - 15 metres wide, and up to 3 metres deep, were dosed with Xypex Admix C-1000 NF, ensuring long term protection and waterproofing integrity. Xypex also conforms to AS 1478.1 as a type SN Special Purpose Admixture and is certified environmentally preferable.